CivicFM

Environment and utilities

Climate and sustainability

Climate plans, emissions, electrification, and extreme heat.

Coming up

26 items on agendas ahead, while a comment still counts

Decided

18 items, newest first

Anaheim · Planning Commission ·

General Plan open-space amendments under SB 1425 Item 3

Parks and treesClimate and sustainabilityZoning and plans

The city proposed amending four elements of the General Plan (Green, Safety, Land Use, and Environmental Justice) to meet Senate Bill 1425, which requires updates to the local open space plan. The amendments add policies on three topics: - Equitable access to open space. - Using natural open space and green infrastructure for climate resilience against fire, flood, and heat. - Looking for rewilding opportunities. Staff found the amendment exempt from CEQA under the common-sense exemption. The commission's vote is a recommendation to the City Council.

  • A commissioner moved to recommend that the City Council approve the General Plan amendment; a commissioner seconded. Amelia Castro (Commissioner; Chairperson, Planning Commission) and Jeanne Tran-Martin (Commissioner) did not answer the roll call. Result: passed, 5 yes.

▶ The recording, at 00:31:34 · On the episode's page

Bakersfield · City Council ·

$19.9 million Willdan contract to build EV charging for the city fleet Item 8.a

Climate and sustainabilityEnergyState and federal policy

The state's Advanced Clean Fleet rules require the city to move its fleet to zero-emission vehicles in stages. Staff said penalties for missing them can reach $10,000 a day starting January 2027, and the DMV can refuse to register new vehicles. The item is a resolution making energy-savings findings, an Energy Savings Performance Contract with Willdan Energy Solutions (not to exceed $19,922,436, agenda), and appropriations of $4,662,996 from the Equipment Fund, $8,263,243 from the Solid Waste Fund, $4,346,005 from the Wastewater Fund, and $1,650,192 from the Domestic Water Fund, a total of $18,922,436 (agenda). The money pays for chargers and electrical infrastructure. Staff said the scope was cut from 21 sites (over $40 million) to seven facilities, which it called eight sites. That is meant to cover the milestones through about 2033 without borrowing. Staff projected about $1,572,000 in PG&E and state rebates and a guaranteed first-year net energy saving of $331,000. The council approved it with Eric Arias (Councilmember, Ward 1) and Ken Weir (Councilmember, Ward 3) absent.

  • Manpreet Kaur (Councilmember, Ward 7; Vice Mayor) moved to adopt the resolution making energy-savings findings, approve the agreement with Willdan Energy Solutions (not to exceed $19,922,436, agenda), and appropriate $18,922,436 (agenda) from the Equipment, Solid Waste, Wastewater, and Domestic Water funds. At Larry Koman (Councilmember, Ward 5)'s request, the motion added a condition that staff give the council an annual update on the project. Result: passed.

▶ The recording, at 00:55:40 · On the episode's page

Long Beach · City Council ·

Continuing the local emergency for Hurricane Marie damage and El Niño storms, with a coastal recovery update Item 25

Disaster recoveryEmergency preparednessClimate and sustainability

The council voted to keep in place the local emergency the city proclaimed after Hurricane Marie damaged the Peninsula shoreline, boardwalk and bulkhead, and to keep reviewing it every 30 days through the 2026–2027 El Niño winter storm season (agenda). Staff gave a broad update. It covered repairs on the Peninsula and beach rebuilding, preparations for the record-level king tides expected over Thanksgiving weekend, and how the work is being paid for. Staff said the money comes from funds that can only be spent on coastal projects, not from the general fund, with a Tidelands emergency reserve drawn on now and the channel dredging paid for separately from the Marina Fund.

  • Continue the local emergency and keep a 30-day review period (mover and seconder not named). Result: passed.

▶ The recording, at 01:20:17 · On the episode's page

San Francisco · Board of Supervisors ·

Port resilience projects exempted from feasibility review Item 37

Climate and sustainabilityStreets and public worksEmergency preparedness

First reading of an ordinance exempting Port capital projects that address flooding, sea level rise or seismic risk from having to submit a financial feasibility study to the Board before environmental review begins (agenda). Sponsored by Matt Dorsey (Supervisor, District 6) with Rafael Mandelman (Supervisor, District 8; President, Board of Supervisors).

  • Passage of item 37 on first reading. Result: passed, 11-0.

▶ The recording, at 01:40:49 · On the episode's page

Los Angeles · City Council ·

Sanitation grant application for climate resilience funds Item 15

Climate and sustainabilityFederal and state funding

Authorizes the Bureau of Sanitation to apply for a Baldwin Hills and Urban Watershed Conservancy Proposition 4 Community and Climate Resilience Grant and adopts a resolution the grantor requires; the agenda says there is no General Fund impact and project funds cover the minimum 25 percent cost share, and Sanitation must report back if the city wins the grant. It passed without discussion.

  • Adopt agenda items 1 and 13 through 16 in a single roll call. Result: passed, 10 ayes; Tim McOsker (Councilmember, Fifteenth District) had left the meeting.

▶ The recording, at 02:42:33 · On the episode's page

Anaheim · City Council ·

20-year solar-plus-battery power purchase from Heartland Solar 1 Item 7

EnergyClimate and sustainability

Anaheim Public Utilities will buy all output from a 150 MW solar and 138.5 MW battery facility in Fresno County for 20 years, at an annual average cost of $47,700,000 and about $955,000,000 over the term (agenda). Staff called it the largest project in the utility's portfolio, enough for roughly 75,000 Anaheim homes, and said it helps meet state mandates of 60% renewable power by 2030. It is paid by utility ratepayers, not the general fund; staff said it would not change bills in the near term.

  • Motion to approve the Renewable Energy Purchase and Storage Agreement with Heartland Solar 1, LLC (mover and seconder not identified). Result: passed, 7-0.

▶ The recording, at 03:19:22 · On the episode's page

Long Beach · City Council ·

Resolution marking 50 years of the California Coastal Act Item 33

Parks and treesClimate and sustainability

Asks the City Attorney to prepare a resolution recognizing the 50th anniversary of the California Coastal Act and the Coastal Commission's mission to protect the coast and public beach access. Members tied it to erosion, storm and tide damage along the city's shoreline.

  • Request the City Attorney prepare the resolution (mover not stated). Result: passed.

▶ The recording, at 03:55:32 · On the episode's page

Pasadena · City Council ·

Hydrogen fueling station items (16 and 17) held Item 16

EnergyClimate and sustainability

Item 16 would have authorized a contract with Clean Energy Fuels Corp. for Phase 1 design-build services for a hydrogen fueling station at 159 S. Kinneloa Avenue, not to exceed $6,884,770 (agenda), and a Measure R funding request to Metro; item 17 would have had the city join the First Public Hydrogen Authority, a joint powers authority. Both were pulled from the agenda at the start of the meeting and not discussed.

▶ The recording, at 00:01:39 · On the episode's page

Pasadena · Finance Committee ·

State transit grant for zero-emission Dial-A-Ride vans Item 1

Public transitFederal and state fundingClimate and sustainability

A resolution letting the City Manager sign the state forms needed to accept a Low Carbon Transit Operations Program allocation from Caltrans, and an amendment to the FY 2027 capital budget putting $147,351 into the Pasadena Dial-A-Ride Fleet Modernization – Zero Emission project. The staff report says the money helps buy five battery-electric Dial-A-Ride vehicles, benefits disadvantaged and low-income populations as the state defines them, and has no impact on the General Fund. The draft resolution splits the amount into Cycle A $89,810 and Cycle B $57,541 (agenda) and sets a goal of putting the vehicles into service by 2030 (agenda). The report is addressed to the City Council through the Finance Committee.

  • Motion to approve the staff recommendation (CEQA finding, resolution authorizing the City Manager to sign the LCTOP forms, and appropriation of $147,351 to the Dial-A-Ride zero-emission fleet project); a councilmember offered to move it, and the mover and seconder are not clearly identified; Tyron Hampton (Councilmember, District 1) was absent. Result: passed, unanimous.

▶ The recording, at 00:00:39 · On the episode's page

Bakersfield · City Council ·

Bid for 15-gallon and 24-inch box trees Item 10a

Parks and treesClimate and sustainability

The council was asked to accept a bid from Zack's Big Trees & Nursery for 15-gallon and 24-inch box trees for the Recreation and Parks Department, in the amount of $274,413.75 (agenda; also read by the clerk). Staff said the bid sets unit prices and does not commit the city to spending that amount. They presented a plan for the $500,000 the council previously set aside for trees, covering contracted plantings, plantings by city staff, schools, community groups and a tree voucher program, with most planting targeted at hotter, low-canopy, disadvantaged areas. The item was deferred from an earlier meeting.

  • A councilmember moved to accept the bid from Zack's Big Trees & Nursery for $274,413.75 (agenda). Result: passed. Abstained: Andrae Gonzales (Councilmember, Ward 2).

▶ The recording, at 03:13:38 · On the episode's page

Orange County · Board of Supervisors ·

Utility rebates for electric vehicle charging infrastructure Item 11

Climate and sustainabilityEnergy

OC Waste & Recycling sought retroactive approval of utility rebate grant applications and acceptance of awards to install electric vehicle charging infrastructure: $455,326 from Southern California Edison's Charge Ready Transport Program and $146,600 from San Diego Gas & Electric's fleet charging program (agenda). The item also authorizes easement deeds and makes a CEQA exemption finding. It covers Districts 3, 4 and 5.

  • Don Wagner (Supervisor, Third District) moved, seconded by Katrina Foley (Supervisor, Fifth District; Vice Chair) (per minutes), to approve as recommended. Result: passed, unanimous.

▶ The recording, at 01:02:15 · On the episode's page

Pasadena · Municipal Services Committee ·

Water and Power general manager responds to public comment on the power content label

EnergyClimate and sustainability

Not an agenda item. After a resident raised Pasadena Water and Power's 2025 power content label, which reports the mix of sources behind the city's electricity, the chair invited the utility's general manager to respond. He discussed the city's carbon-free-by-2030 policy and why the gas-fired Glenarm plant ran more in 2025.

▶ The recording, at 00:04:32 · On the episode's page

San Francisco · Board of Supervisors ·

Consent agenda: Compton's Cafeteria landmark and municipal green building rules Item 1-2

Historic preservationClimate and sustainability

Two ordinances recommended by the Land Use and Transportation Committee were voted on together on consent, as routine items: a Planning Code amendment to the landmark designation for the Site of the Compton's Cafeteria Riot, and an Environment Code update to municipal green building requirements. This was their final passage.

  • Items 1 and 2 on consent, finally passed by roll call. Result: passed, 9-0.

▶ The recording, at 00:10:28 · On the episode's page

Los Angeles · City Council ·

Extension of the Statewide Clean Fuel Rewards Program agreement (CF 26-1215) Item 1

Climate and sustainabilityEnergy

Concurs with the Board of Water and Power Commissioners' August 25, 2026 approval of a Second Amendment to the governance agreement for the Statewide Clean Fuel Rewards Program, extending it through January 28, 2030 (agenda). No fiscal impact statement was submitted. The council adopted it with items 2–5 in one roll call, and Adrin Nazarian (Councilmember, Second District) asked that it be sent forthwith.

  • Adopt items 1 through 5 together. Result: passed, 11 ayes.
  • Adrin Nazarian (Councilmember, Second District) requested that items 1 and 2 be sent forthwith. Result: passed.

▶ The recording, at 02:44:22 · On the episode's page

Los Angeles · City Council ·

Proposed city support for AB 2635 noted and filed Item 8

State and federal policyPollutionClimate and sustainability

A Rules, Elections and Intergovernmental Relations Committee recommendation to add support for AB 2635 to the city's state legislative program. To the extent funding is appropriated, the bill would require air districts or local governments to offer commercial vouchers for zero-emission small off-road equipment, the kind used by gardeners and landscapers. The resolution was introduced by Eunisses Hernandez (Councilmember, First District) with Imelda Padilla (Councilmember, Sixth District), per the agenda. Eunisses Hernandez (Councilmember, First District) moved instead to note and file it, which files the item without adopting the support position, and Ysabel Jurado (Councilmember, Fourteenth District) seconded. No reason was given on the record.

  • Eunisses Hernandez (Councilmember, First District) moved, Ysabel Jurado (Councilmember, Fourteenth District) seconding, to note and file item 8. Result: passed, 13-0.

▶ The recording, at 02:06:19 · On the episode's page

Burbank · Planning Commission ·

New 420-room dual-brand hotel and parking garage at the Marriott site, 2500 North Hollywood Way Item 1

Development projectsHousing supplyClimate and sustainability

A public hearing on Project No. 16-0003953. The applicant wants to build a new seven-story, 420-room hotel under two brands (Aloft for regular stays and Residence Inn for extended stays) and a separate four-story parking garage. Both would go on surface parking at the existing Marriott hotel and convention center, which would stay open. The site is 11.76 acres bounded by Thornton Avenue, Hollywood Way and Avon Street, across from Hollywood Burbank Airport, and is designated Regional Commercial. The commission was asked to recommend that the City Council approve a Planned Development (site-specific zoning), a ten-year Development Agreement and Development Review. It was also asked to recommend that the Council certify the Final Environmental Impact Report, adopt a mitigation monitoring program and adopt a Statement of Overriding Considerations. That statement is required because, according to staff, three impact areas stay significant and unavoidable even with mitigation: greenhouse gas emissions, construction noise, and the construction noise tied to utility work. The City Council makes the final decision. Speakers were split: union and tenant-group speakers asked for a housing component and stronger emissions and transit measures, while business, labor and hotel-employee speakers backed the project.

  • A commissioner moved to recommend that the City Council approve Project No. 16-0003953 by certifying the Final EIR, adopting the mitigation monitoring program with a Statement of Overriding Considerations and the CEQA findings, and adopting an ordinance approving the Planned Development, Development Agreement and Development Review. The motion amended conditions of approval 16 and 24 to raise the renewable energy share from 10% to 11%, and let the city attorney make editorial clarifications on the project's scope. A commissioner seconded. Result: passed, 5-0.

▶ The recording, at 00:10:08 · On the episode's page

Los Angeles · City Council ·

Transportation department may apply for state climate grant with the housing authority Item 50

Public transitFederal and state fundingClimate and sustainability

Authorizes the Los Angeles Department of Transportation to apply, as a subrecipient to the Housing Authority of the City of Los Angeles, for up to $5,014,000 from the state's Transformative Climate Communities Round 6 program, and to report back on implementation if selected (agenda). Per the agenda, the money would cover a Mobility Wallet component and transit operations for the existing Commuter Express 142 line, with Measure M and Prop A money used as matching funds.

  • Adopt items 31 through 33 and 35 through 50 in one vote. Result: passed.
  • Send item 50 forthwith, as requested by a speaker. Result: passed.

▶ The recording, at 00:11:34 · On the episode's page