Burbank · Planning Commission ·

Follow-up study session on the draft Downtown TOD Specific Plan Item 2

Zoning and plansHousing supplyPublic transit

Staff asked the commission for feedback on the draft Downtown Transit Oriented Development Specific Plan (Project No. 18-0003736), the result of a six-year planning effort, as a follow-up to an August study session. The plan would rezone downtown to allow mixed use and housing nearly everywhere, set building heights from 40 feet near single-family homes up to 300 feet in a freeway overlay, and replace much of the current case-by-case planned development and development agreement process with by-right heights plus development review. That would shape what can be built around the Metrolink station, the Burbank Town Center mall, and the San Fernando corridor. Staff said a draft program environmental impact report is expected to be circulated later this year, with adoption hearings by spring 2027. This was a note-and-file item and no vote was taken.

  • Note and file the report; no motion made. Result: no action.

▶ The recording, at 00:28:09 · On the episode's page

San Diego · City Council ·

Data center moratorium returned to staff, moved to Tuesday Item S401

Data centersZoning and plans

Item S401 is an emergency ordinance that would put a temporary moratorium on developing, establishing, intensifying or expanding data centers citywide, along with a resolution finding the action exempt from state environmental review (CEQA). The agenda says the ordinance needs 8 votes under California Government Code section 65858 and isn't subject to the Mayor's veto. On Monday the item was returned to staff without presentation or deliberation, to be heard Tuesday, October 27, at 10 a.m. as Item S510. Public comment was still taken.

  • Item S401 returned to staff, to be heard Tuesday, October 27, as Item S510. Result: continued.

▶ The recording, at 00:17:36 · On the episode's page

San Diego · City Council ·

First step to overrule airport commission on child care centers near MCAS Miramar Item 201

Zoning and plansChildren and familiesAirports and aviation

The council voted to propose overruling the San Diego Airport Land Use Commission. On July 9 the commission found Item 93 of the city's 2026 Land Development Code update inconsistent with the MCAS Miramar airport land use compatibility plan. Item 93 would allow new child care centers as a limited use, capped at a 0.42 floor area ratio, in the Miramar 'transition zone', where new centers are now prohibited. Existing centers there may already expand or rebuild up to 300 people per acre, and staff said the cap matches that limit. State law requires a two-thirds vote at two separate public hearings to overrule the commission; the agenda says 6 votes were required. Next, the Planning Commission makes a recommendation, and a second full council hearing comes at least 45 days after this one. The agenda lists Districts 1 and 6 as affected, and staff named community planning areas including Torrey Pines, University, Mira Mesa, Clairemont and Kearny Mesa. The motion passed 6-0 with three members absent.

  • Kent Lee (Councilmember, District 6; President Pro Tem, City Council) moved the staff recommendation: adopt a resolution proposing to overrule the Airport Land Use Commission's inconsistency determination for Item 93, send notice to the commission, Caltrans and the U.S. Marine Corps, and schedule the item at the Planning Commission; Sean Elo-Rivera (Councilmember, District 9) seconded. Result: passed, 6-0.

▶ The recording, at 01:43:45 · On the episode's page

San Jose · Planning Commission ·

Welcome and Planning Director's overview Item 3

Zoning and plansState and federal policyData centers

The commission's annual retreat, a study session with no votes. The Planning Director gave an overview of the department's workload. He said two things dominate it: data centers, with a new city data center policy heading to the commission and then the City Council, and the flood of state housing and land-use laws, which he said now drive most of the city's long-range planning work.

▶ The recording, at 00:01:09 · On the episode's page

San Jose · Planning Commission ·

Builder's Remedy, Housing Element and SB 79 updates Item 4

Housing supplyZoning and plansAffordable housing

Planning staff explained where things stand on three state housing rules. Builder's Remedy let developers bypass San Jose's general plan and zoning while the city lacked a state-certified housing element. The housing element itself is the city's state-required plan to make room for about 62,000 new homes by 2031. SB 79 is a new state law allowing housing within half a mile of many transit stations. Together these determine where housing can go in San Jose, and how much say the city and the commission have over it.

▶ The recording, at 00:06:07 · On the episode's page

San Jose · Planning Commission ·

State legislative changes and updates Item 5

State and federal policyHousing supplyZoning and plans

A senior deputy city attorney and planning staff walked through new state laws that limit local control over housing. These include the Starter Home Revitalization Act amendments, AB 1751, which allows by-right townhomes starting January 1, density bonus changes, a second ADU per lot, a CEQA exemption for the Diridon Station modernization, and environmental review changes. Staff said some of these laws could replace denser housing the city planned along corridors like Stevens Creek with townhomes, and leave historic properties unprotected.

▶ The recording, at 00:52:14 · On the episode's page

San Jose · Planning Commission ·

Data centers: background ahead of proposed city standards Item 6

Data centersZoning and plans

City Manager's Office staff answered commissioners' questions about data centers before the proposed citywide data center standards come to the commission on November 18 and the City Council on December 8. Topics included where data centers are allowed, how they are permitted, the revenue the city expects, and emissions. Staff also described a proposed change that would send appeals of data center permits straight to the City Council, where today the Planning Commission has the final say. A commissioner objected that it takes away a hearing where residents can speak; staff said it answers residents who want the council to decide controversial data center cases.

▶ The recording, at 01:33:05 · On the episode's page

Oakland · Rules and Legislation Committee ·

Scheduling the data center moratorium report and proposed extension Item 3.2

Data centersZoning and plans

On October 6, 2026, the council approved a 45-day interim emergency moratorium, Ordinance No. 13899 C.M.S. (agenda). It pauses approval of land use entitlements and agreements for developing or operating data centers in Oakland. The item is sponsored by Carroll Fife (Councilmember, District 3; Chair, Life Enrichment Committee) and the Planning and Building Department and has two parts. First is a resolution adopting the written report that Government Code section 65858(d) requires within 35 days of the moratorium's passage. The report describes the measures taken to address the conditions that led to the moratorium, and the resolution makes CEQA findings. Second is an interim emergency ordinance extending the moratorium by ten months and fifteen days. The committee scheduled both for the November 10, 2026 special City Council agenda as a public hearing. It used Rule 24 to bypass committee review because state law deadlines require the hearing on that date.

  • Janani Ramachandran (Councilmember, District 4; Chair, Finance and Management Committee) moved, seconded by Rowena Brown (Councilmember, At Large; Chair, Community and Economic Development Committee; Chair, Education Partnership Committee), to approve item three as is, which scheduled items 3.1 and 3.2 as requested. Result: passed, 4-0.

▶ The recording, at 00:06:24 · On the episode's page

LA County · Regional Planning Commission ·

Commercial cannabis zoning ordinance and program environmental impact report Item 11

CannabisZoning and plansCode enforcement

The county proposes amending Title 22, its planning and zoning code, to allow commercial cannabis businesses in certain zones of unincorporated Los Angeles County. This is one of two parts of a Commercial Cannabis License Program; the other part, amendments to Title 8 (licensing and operating rules), goes to the Board of Supervisors separately. The commission also considered a Program Environmental Impact Report with findings, a statement of overriding considerations and a mitigation monitoring program (agenda). The item was continued from August 26, 2026 without the hearing being opened. The commission only makes a recommendation; the Board of Supervisors decides. As presented by staff, the rules would decide where cannabis storefronts, delivery businesses, cultivation, manufacturing, distribution and testing labs could locate: only in some commercial, commercial-only mixed-use and industrial zones, in existing buildings, and indoors, with a 600-foot buffer from schools, parks, libraries, day cares, licensed arcades and drug treatment facilities, and 500 feet between storefronts. Staff said there would be 90 licenses in total, 25 of them storefronts. Much of the debate was about unlicensed shops already operating in unincorporated communities and who enforces against them.

  • A commissioner moved to close the public hearing and recommend that the Board certify the final Program Environmental Impact Report and adopt the findings of fact, statement of overriding considerations and mitigation monitoring and reporting program for the commercial cannabis license program and zoning ordinance, subject to the Board finding the final Title 8 amendments consistent with the project description and the EIR. Seconder not clearly identified. Result: passed.
  • A commissioner moved to adopt the resolution recommending that the Board of Supervisors approve the commercial cannabis zoning ordinance (Project No. PRJ2024-000811, Advance Planning Case No. RPPL2024001191) with staff's recommended revisions and two added conditions: that churches and places of worship be added to the sensitive uses covered by the buffer, and that a letter from Robert Luna (Sheriff) on the cost of enforcement to shut down illegal businesses be attached. At county counsel staff's prompting, the motion also added a letter from the commission urging the Board to deal with enforcement against illegal shops immediately. Seconder not clearly identified. Result: passed, 5-0.

▶ The recording, at 00:06:34 · On the episode's page

Oakland · City Council ·

Mayor's appointee confirmed to Planning Commission Item 5.1

Appointments and leadershipZoning and plans

A resolution confirming Barbara Lee (Mayor)'s appointment of a land-use attorney and former Planning Commission chair to the City Planning Commission. The mayor's office said he has more than thirty-five years of legal experience. The appointee told the council he would push to streamline planning, said displacement is something the commission can weigh in on even though it isn't its main job, and pointed to the general plan update expected next spring. The council confirmed him.

  • Motion by Noel Gallo (Councilmember, District 5; President Pro Tempore), seconded by Zac Unger (Councilmember, District 1; Chair, Public Works and Transportation Committee), to adopt the resolution confirming the appointment. Result: passed, 7-0, 1 excused.

▶ The recording, at 01:55:02 · On the episode's page

San Jose · City Council ·

Citywide planning work plan priorities and missing middle housing direction Item 8.1

Zoning and plansHousing supply

Sets what the city's long-range planning staff will work on through December 2027. Staff say they are at about 130 percent of capacity, mostly because of state housing mandates. That means council-requested projects, such as the Coyote corridor study, keep getting pushed back. The central issue was 'missing middle' housing in single-family neighborhoods, which the city's state-certified housing element commits it to. In August the council directed study of 16, 24 and 32 units per acre. Two council memos sought changes. The memo from Matt Mahan (Mayor), Pam Foley (Councilmember, District 9; Vice Mayor), Pamela Campos (Councilmember, District 2), Anthony Tordillos (Councilmember, District 3) and Michael Mulcahy (Councilmember, District 6) asked staff to study tiered densities based on distance from transit and to add childcare policy work in place of the retail-in-residential-neighborhoods work. The memo from Domingo Candelas (Councilmember, District 8), George Casey (Councilmember, District 10), Peter Ortiz (Councilmember, District 5) and David Cohen (Councilmember, District 4) sought to keep current densities in areas with limited transit. Staff warned that excluding high-resource areas could put the housing element at risk with the state housing department (HCD), and that losing certification would reopen the 'builder's remedy'. The council passed the first memo 9-2 after rejecting a substitute that would have added the second.

  • Substitute motion by George Casey (Councilmember, District 10): approve the memo from Domingo Candelas (Councilmember, District 8), George Casey (Councilmember, District 10), Peter Ortiz (Councilmember, District 5) and David Cohen (Councilmember, District 4) together with the memo from Matt Mahan (Mayor), Pam Foley (Councilmember, District 9; Vice Mayor), Pamela Campos (Councilmember, District 2), Anthony Tordillos (Councilmember, District 3) and Michael Mulcahy (Councilmember, District 6), with the return timeline changed to as soon as possible, plus a friendly amendment from Bien Doan (Councilmember, District 7) directing city staff, including the City Manager's intergovernmental relations team and the City Attorney, to research local land-use control options for the January 2027 legislative program discussion. Result: failed. No: Rosemary Kamei (Councilmember, District 1), David Cohen (Councilmember, District 4), Pam Foley (Councilmember, District 9; Vice Mayor), Anthony Tordillos (Councilmember, District 3), Pamela Campos (Councilmember, District 2), Michael Mulcahy (Councilmember, District 6).
  • Pam Foley (Councilmember, District 9; Vice Mayor) moved the memo from Matt Mahan (Mayor), Pam Foley (Councilmember, District 9; Vice Mayor), Pamela Campos (Councilmember, District 2), Anthony Tordillos (Councilmember, District 3) and Michael Mulcahy (Councilmember, District 6), changing the return date from end of March to as soon as possible, adding consideration of current densities for sites in moderate to severe fire hazard zones, and adding Bien Doan (Councilmember, District 7)'s local-control research amendment. Result: passed, 9-2. No: Domingo Candelas (Councilmember, District 8), George Casey (Councilmember, District 10).

▶ The recording, at 02:01:49 · On the episode's page

San Jose · City Council ·

Early consideration: 525 Race Street general plan change for a private high school Item 10.2

Zoning and plansSchools and educationDevelopment projects

An early-stage go-ahead for BASIS Independent Schools to keep pursuing a general plan amendment on a site of about 3.98 gross acres (agenda) at 525 Race Street in District 6. The change would switch the land use from Industrial Park to Combined Industrial/Commercial so that a vacant 72,000-square-foot office building could become a private high school for up to 800 students and 100 staff, with a gym addition of about 6,000 square feet. This vote only lets processing continue. A final decision could come at a hearing cycle at the end of 2027. The Planning Commission recommended approval 10-0-1 (agenda).

  • Michael Mulcahy (Councilmember, District 6) moved to continue processing the general plan amendment (seconder not named); Peter Ortiz (Councilmember, District 5) absent. Result: passed, unanimous.

▶ The recording, at 04:03:28 · On the episode's page

San Francisco · Board of Supervisors ·

Streamlining the city's local CEQA procedures Item 4

Development projectsZoning and plans

Changes the Administrative Code's local procedures under the California Environmental Quality Act. As read by the clerk, it removes shadow analysis as a specific type of environmental impact, cuts the time to appeal CEQA determinations to the Board from 30 to 15 days, removes some procedures for environmental documents CEQA doesn't require, and implements recent state law changes on when CEQA compliance happens. This was final passage, and the only divided vote of the meeting.

  • Final passage of the ordinance by roll call. Result: passed, 8-1. No: Connie Chan (Supervisor, District 1).

▶ The recording, at 00:12:18 · On the episode's page

San Francisco · Planning Commission ·

Treasure Island / Yerba Buena Island: initiating General Plan amendments Item 7

Zoning and plansHousing supply

The commission was asked to initiate, not adopt, amendments to the Treasure Island/Yerba Buena Island Area Plan in the General Plan. The amendments would remove two detailed maps (Map 3, the setback plan, and Map 4, a street wall calculation example) and renumber the rest, with those details kept in the Design for Development. This is part of a larger package of amendments that staff said could allow about 2,800 more housing units within existing height limits, on top of the 8,000 approved in 2011. Initiating the amendments lets the commission schedule an adoption hearing, which would also take up changes to the Design for Development and the Special Use District.

  • Motion to initiate the General Plan amendments and schedule an adoption hearing on or after November 19, 2026, made after the clerk recognized Joel Koppel (Commissioner; Vice President, Planning Commission); seconded. Result: passed, 7-0.

▶ The recording, at 00:20:57 · On the episode's page

LA County · Regional Planning Commission ·

Update on rewriting the county's Renewable Energy Ordinance Item 9(a)

EnergyZoning and plansWarehouses and industry

County planning staff gave a progress report, with no vote, on updating the 2016 Renewable Energy Ordinance. The ordinance sets where renewable energy projects can go in unincorporated areas. Two Board of Supervisors motions directed the work, one in December 2023 and one in April 2024. The draft ordinance would add rules for battery energy storage system facilities and for green hydrogen production facilities. It would limit utility-scale solar, battery storage, and green hydrogen to certain agricultural, manufacturing, commercial-manufacturing, and institutional zones. Battery and hydrogen facilities could not go in significant ecological areas, very high fire hazard severity zones, environmentally sensitive sites, or agricultural resource areas, and could not be within 300 feet of a sensitive use. Utility-scale generation and storage would become allowed in the Antelope Valley's economic opportunity areas. The ban on utility-scale wind stays. A proposed amendment to the Antelope Valley Area Plan is also part of the project. A program environmental impact report is being drafted.

▶ The recording, at 00:05:51 · On the episode's page

Pasadena · Planning Commission ·

Ronald McDonald House expansion: zone change, permit modification, variances, lot merger and tree removal (763/765 S. Pasadena Ave. and 762 S. St. John Ave.) Item 3A

Development projectsZoning and plansHistoric preservation

Ronald McDonald House Charities of Southern California asked to expand its Pasadena hospitality home, which houses families of children getting treatment at nearby hospitals, onto two parcels on S. St. John Avenue: 762 S. St. John Ave. and a vacant parcel (AIN 5719-005-908). The package includes a zone change from RS-4 to RS-4 HH (Hospitality Home overlay) for those two parcels, and a modification of the existing minor conditional use permit to cover them. It also asks for a variance to pave 54 percent of the Pasadena Avenue front yard where 30 percent is allowed, for a circular driveway; a variance and a minor variance for a solid, six-foot fence along St. John Avenue where 50 percent openness and four feet are required; a certificate of exception to merge the four parcels into two; and removal of one Chinese Elm (agenda). Staff described other work: an elevator addition and accessibility remodels to the two Craftsman houses, a replacement Building C of about 1,200 square feet, and a parking lot of up to 25 spaces off St. John with a trash enclosure. Staff said capacity stays at up to 17 families with no change in staff. The commission only makes a recommendation; the City Council decides. The site sits next to a single-family landmark district across St. John Avenue, and the two Pasadena Avenue houses and the St. John building are contributing historic buildings.

  • A commissioner moved staff's recommendation that the City Council adopt the CEQA exemption and approve the applications, with three added or clarified conditions of approval; a commissioner seconded. At a commissioner's request, the fence-height minor variance (agenda item 5 of the seven applications) was split off, and this vote covered everything else. Result: passed. No: a commissioner.
  • Separate vote on the minor variance allowing a six-foot front-yard fence along St. John Avenue where four feet is allowed. Result: passed. No: a commissioner, a commissioner.

▶ The recording, at 00:01:57 · On the episode's page

Pasadena · Planning Commission ·

Subdivision and zoning code amendments for state housing laws (SB 684/1123, SB 450/AB 1061, ministerial lot splits) continued Item 3B

Housing supplyZoning and plansState and federal policy

These amendments to Titles 16 and 17 of the municipal code would carry out state laws. They would allow small-lot subdivisions and housing projects of 10 or fewer lots in residential zones, keep two-unit (SB 9) projects from facing stricter standards than other housing, allow SB 9 projects in historic districts if no historic structure is affected, and process lot line adjustments and subdivisions of four or fewer lots ministerially (agenda). The agenda recommended continuing the item to October 28. Staff instead asked to continue it to a date uncertain so they could fold in new state bills the governor had signed.

  • Motion to continue item 3B to a date uncertain; moved and seconded (movers not clearly identified in the audio). Result: continued, unanimous.

▶ The recording, at 01:29:47 · On the episode's page

Pasadena · Housing, Homelessness & Planning Committee ·

How the city handles concessions and waivers under the state density bonus law Item 1

Housing supplyZoning and plansAffordable housing

This was an information report the committee had asked for. Under the State Density Bonus Law, a developer who sets aside homes at below-market prices can build more units than local zoning allows. The developer can also ask for up to five concessions from development standards, such as floor area or height, and for as many waivers as needed, such as setback or building-separation rules. The staff memo says the city's ability to deny these requests is very limited. Pasadena currently has 23 major housing projects (70 or more units each) submitted or under construction, totaling 4,160 units. Of those, 1,066 (25.6%) are bonus units and 1,525 (36.7%) will be affordable (agenda). Staff is updating Zoning Code Chapter 17.43 to remove the old separate Affordable Housing Concession Permit process. Concessions and waivers would instead be reviewed together with a project's other approvals. That change is expected at City Council in early 2027. Information only; no vote.

▶ The recording, at 00:01:48 · On the episode's page

Pasadena · Housing, Homelessness & Planning Committee ·

Proposed changes to predevelopment plan review rules (pushed to next meeting) Item 3

Development projectsZoning and plans

Staff proposed removing the provision that lets a councilmember or the planning director ask for a large project's predevelopment plan review to be presented to the City Council as an information item. Under state law (SB 330), that presentation would count as one of the five public meetings allowed for a qualifying housing project. Staff would instead give this committee general updates on newly submitted projects, which would not count toward the limit (agenda). Staff is seeking a recommendation. The item was not heard and was pushed to the next meeting after a committee member had to leave.

  • Defer the item to the next meeting (by consensus; no formal motion). Result: continued.

▶ The recording, at 01:45:47 · On the episode's page

San Francisco · Planning Commission ·

Report on recent Board of Supervisors actions Item 6

Historic preservationData centersZoning and plans

Staff's regular report on actions by the Board of Supervisors, the Board of Appeals and the Historic Preservation Commission that affect planning, including landmark designations, an interim zoning moratorium on data centers, and changes to the city's local environmental review procedures.

▶ The recording, at 00:22:12 · On the episode's page

LA County · Board of Supervisors ·

Data center zoning motion referred back to sponsor Item 14

Data centersZoning and plans

Hilda Solis (Supervisor, First District; Chair)'s motion would have had Regional Planning draft a Title 22 zoning amendment, with an environmental (CEQA) analysis. The amendment would define data centers by acreage, square footage, energy use and water use, and would ban large-scale data centers, such as hyperscale and AI facilities, in all zones. The motion also asked for a review of noise rules covering low-frequency noise and for a moratorium to be ready if a threatening data center is proposed in an unincorporated area. At Hilda Solis (Supervisor, First District; Chair)'s request, the item was referred back to her office. No reason was given on the record.

  • Janice Hahn (Supervisor, Fourth District) moved, seconded by Kathryn Barger (Supervisor, Fifth District), to approve the continuances and referral read by the executive officer, including sending item 14 back to Hilda Solis (Supervisor, First District; Chair)'s office (no vote on the motion itself). Result: no action.

▶ The recording, at 00:15:07 · On the episode's page

Los Angeles · City Council ·

Harbor community plans, ADU size limits, linkage-fee refunds, equestrian rules, micro-trenching and cannabis license renewals, approved in one vote Item 2-4, 7-10

Zoning and plansCannabisHousing supply

Items whose public hearings were already held in committee were approved together without discussion. Items 2 and 3 revise earlier council actions on the Wilmington-Harbor City and Harbor Gateway community plan updates (CF 25-0774, 25-0775), including ordinance language letting City Planning prepare technical corrections for one year and environmental-protection standards for sites near the border-zone property dataset and for construction hauling. Item 4 tells City Planning to bring the Missing Middle Ordinance with an option capping an attached ADU at 50 percent of the existing home and 1,200 square feet, and to report within 60 days on SB 9 and SB 1211 and on the breezeway loophole (agenda). Item 7 asks for an ordinance allowing refunds of up to $35,000 of the Affordable Housing Linkage Fee for single-family projects started but never finished, retroactive to permits expired in the last 3 years, with the fee collected again if the property is later built (agenda). Item 8 asks for an ordinance reconciling equine-keeping and housing rules. Item 9 adopts on first consideration an ordinance allowing rapid micro-trenching with the same street damage restoration fee as regular micro-trenching. Item 10 tells the Department of Cannabis Regulation to renew licenses for businesses that would have been eligible for the 2027 cannabis tax amnesty program, regardless of tax delinquency, and asks for an ordinance removing the tax requirement in LAMC 104.12(c)(1) for the September-November 2026 renewal period (agenda). Item 10 drew many public comments from social equity cannabis operators.

  • Adopt items 2 through 4 and 7 through 10 in a single roll call. Result: passed, 12-0.

▶ The recording, at 00:49:02 · On the episode's page

Los Angeles · City Council ·

One-year extension of the citywide pause on RV parks as public benefit projects Item 15

Zoning and plans

Extends the RV Parks Interim Control Ordinance (Ordinance No. 188753) to October 30, 2027, keeping a citywide ban on permits for RV parks approved as public benefit projects under LAMC 14.00(A)(7). The resolution calls it the second and last one-year extension while the city works on permanent rules (agenda). Supporters described existing RV parks in Wilmington as unsafe and inaccessible to emergency vehicles; the one no vote objected to how long City Planning is taking.

  • Adopt item 15, the committee report and resolution (Monica Rodriguez (Councilmember, Seventh District) and Bob Blumenfield (Councilmember, Third District; President Pro Tempore)) extending the RV park interim control ordinance to October 30, 2027. Result: passed, 13-1. No: Nithya Raman (Councilmember, Fourth District).

▶ The recording, at 02:08:42 · On the episode's page

San Francisco · Board of Supervisors ·

Streamlining the city's local CEQA procedures, including a shorter appeal window Item 21

Zoning and plansDevelopment projects

An ordinance changing how San Francisco handles the California Environmental Quality Act locally. It removes shadow analysis as a specific type of environmental impact, cuts the time to appeal CEQA determinations to the Board of Supervisors from 30 days to 15, removes procedures for environmental documents CEQA doesn't require, and puts recent state-law changes on CEQA timing into effect. The shorter window changes how quickly residents must file if they want to challenge a project's environmental review before the Board. It passed on first reading on a divided roll call.

  • Pass the ordinance on first reading, by roll call (requested from the dais). Result: passed, 10-1. No: Connie Chan (Supervisor, District 1).