An informational report, requested by Charlene Wang (Councilmember, District 2; Chair, Public Safety Committee), on the October 21 outage that took Oakland's 911 lines offline after copper and fiber lines outside the Edgewater dispatch center were severed in what staff said is believed to be theft. Calls went unanswered for about 69 minutes before rerouting to the Alameda County Sheriff, and full repairs took about 36 hours. Staff said hardening the lines depends on AT&T, new redundancy may need budget, and moving 911 off copper needs state approval.
Charlene Wang (Councilmember, District 2; Chair, Public Safety Committee) moved, seconded by Ken Houston (Councilmember, District 7), to receive and forward the informational report to the December 1 City Council agenda on consent. Result: passed, 4-0.
A public hearing creating the Bay Ho 03 underground utility district in Council District 2, which requires utilities to move overhead lines underground and property owners in the district to convert their service connections. Staff said it is a joint SDG&E and city project serving 249 properties, trenching and restoring 1.61 miles of streets, replacing about 29 curb ramps, adding about 30 streetlights and removing 112 poles. The resolution authorizes the Mayor or designee to set an undergrounding schedule and notify affected owners (agenda).
Jennifer Campbell (Councilmember, District 2) moved the staff recommendation, seconded by Stephen Whitburn (Councilmember, District 3); Marni von Wilpert (Councilmember, District 5) and Sean Elo-Rivera (Councilmember, District 9) absent. Result: passed, 7-0.
An appeal of the environmental clearance (a categorical exemption from CEQA) for an AT&T wireless facility on the roof of an existing 54-foot, five-story apartment building at 2069 North Argyle Avenue (6261 West Holly Mount Drive) in Hollywood: nine panel antennas, 14 remote radio units, cabinets and batteries behind 8-foot-8-inch screen walls (agenda). The appellant argued the hillside, very high fire hazard location should rule out the exemption. The committee denied the appeal, so the exemption stands.
The committee chair moved to deny the appeal and sustain the Central Los Angeles Area Planning Commission's approval of a categorical exemption from CEQA for the facility at 2069 North Argyle Avenue, and to find that the project is exempt under CEQA Guidelines Section 15303, Class 3, with no exceptions under Section 15300.2 applying. Nithya Raman (Councilmember, Fourth District; Vice Chair, Planning and Land Use Management Committee) was absent. Result: passed, 4-0.
A set of 13 changes to the city's FY 2027 capital (construction and equipment) budget. Together they add a net $7,521,019 to the capital budget with no change to the General Fund (agenda). The biggest piece is $5,000,000 from the Underground Utilities Fund for street lighting on the Raymond Avenue undergrounding project, which is in design, with construction expected to start in March 2027 (agenda). The list also includes $750,000 from the Building Preventive Maintenance Fund for building maintenance (agenda). The staff report ties this to City Hall elevators: one recently broke down between floors with seven people trapped for almost two hours, and replacement parts are hard to find. Other pieces are a $1,000,000 federal HUD Community Project Funding grant to renovate the long-closed pottery/kiln room at the Jackie Robinson Community Center and make accessibility improvements; $116,029 collected from property owners and developers for sidewalk repairs; $250,000 in CDBG funds plus $75,000 in Street Occupancy Rental Fees for accessible pedestrian signal push buttons at 20 intersections; and several smaller Traffic Reduction Fee amounts to cover costs the traffic-safety grants don't pay for. Water and Power also moves money between projects without increasing it: $899,104, $1,360,872 and $446,930 (agenda).
Rick Cole (Councilmember, District 2) moved the staff recommendation (the seconder called it his amendment); the second came from a member whose words fall under label S4; Victor Gordo (Mayor) was absent. Result: passed, unanimous.
AT&T is moving to retire traditional copper landlines. A member of the public, writing in after the Eaton Fire, asked the committee to recommend that the council formally oppose withdrawing copper service in high wildfire-risk and poor-coverage areas until a replacement is independently shown to work through multi-hour power outages and mass evacuations. The request also asked the council to urge the FCC and CPUC to require that testing, and to have staff return within 45 days with a draft resolution. The packet letters say copper lines carry their own power and still support alarms and medical-alert devices, and that the FCC has given AT&T a path to discontinue copper service on or after June 1, 2027. The committee asked staff to look into it further; no vote was taken.